Loading
Designer Notes & Corrections
April 2009 issue

APRIL 2009
Issue 160

PROJECT 20: DEEP VEE PULLOVER
LATTICE STITCH
(Row 4 was omitted from the pattern)
Row 2 and all WSRs except Row 4: Knit the knit sts and purl the purl sts as they face you.
Row 3: P4, *K2, P1, K2, P7; rep from * to last 9 sts; K2, P1, K2, P4.
Row 4 (WS): P4, *K2, P1, K2, P7; rep from * to last 9 sts; K2, P1, K2, P4.
Project 12: Cotton Silk Chevron Shell
BACK
With longer circ ndls, CO 106 (122, 138) sts. Knit 2 rows. K1, purl to last st; K1. Next row (RS): Work Row 1 of Stitch Pattern to last st. Work even in patt until piece meas 13 (14, 15)” from CO, end after Row 4 of Stitch Pattern.
Project 13: Spring Cabled Cardigan

BACK
Establish Panels
Row 1 (RS): P2 (1, 2, 1). (K3, P3) 5 (6, 7, 8) times, work Row 1 of Rib Panel A over next 18 sts, (P3, K3) 6 (7, 7, 8) times, P3, work Row 1 of Rib Panel B over next 18 sts, (P3, K3) 5 (6, 7, 8) times, P2 (1, 2, 1).
Row 2: K2 (1, 2, 1), (P3, K3) 5 (6, 7, 8) times, work Row 2 of Rib Panel B over next 18sts, (K3, P3) 6 (7, 7, 8) times, K3, work Row 2 of Rib Panel A over next 18 sts, (K3, P3) 5 (6, 7, 8) times, K2 (1, 2, 1).

LEFT FRONT
Establish Panels
Row 1 (RS): P2 (1, 2, 1), (K3, P3) 5 (6, 7, 8) times, work Row 1 of Rib Panel A over next 18 sts, (P3, K3) 3 (3, 3, 4) times, P 0 (3, 3, 0), K1.
Row 2: P 1, K 0 (3, 3, 0), (P3, K3) 3 (3, 3, 4) times, work Row 2 of Rib Panel A over next 18 sts, (K3, P3) 5 (6, 7, 8) times, K 2 (1, 2, 1).

RIGHT FRONT
Establish Panels
Row 1 (RS): K1, P 0 (3, 3, 0), (K3, P3) 3 (3, 3, 4) times, work Row 1 of Rib Panel B over next 18 sts, (P3, K3) 5 (6, 7, 8) times, P2 (1, 2, 1).
Row 2: K2 (1, 2, 1), (P3, K3) 5 (6, 7, 8) times, work Row 2 of Rib Panel B over next 18 sts, (K3, P3) 3 (3, 3, 4) times, K 0 (3, 3, 0), P1.
Project 28: Chic Bamboo
Chart for this project can be found on page 126; however Click here for corrected chart (pdf format)
Project 32: Cabled Henley Pullover
Body
CO 156 (168, 192, 216) sts. PM and join for working in the round being careful not to twist. Rnd 1: P9 (11, 14, 17) sts, work Rnd 1 of Tight Braid Left over 10 sts, P8 (9, 12, 15) sts, work Rnd 1 of Honeycomb Pattern over 24 sts, P8 (9, 12, 15) sts, work Rnd 1 of Tight Braid Right over 10 sts, P9 (11, 14, 17) sts, pm, P9 (11, 14, 17) sts, work Rnd 1 of Tight Braid Left over 10 sts, P8 (9, 12, 15) sts, work Rnd 1 of Honeycomb Pattern over 24 sts, P8 (9, 12, 15) sts, work Rnd 1 of Tight Braid Right over 10 sts, P9 (11, 14, 17) sts. Work even in patt as set until piece meas 14.25 (14.75, 15.25, 15.75)" from CO. Sl all sts to waste yarn and set aside.
Project 39: Rose Lace Jacket
Body
Cont as est until piece meas 6 ½ (7, 7 ½, 8½)” from CO row, end after RSR.
Divide for Fronts and Back
Next row (WS): Patt across 25 (29, 31, 33).