Loading
Designer Notes & Corrections

April 2011

December 2011
Issue 176

Project 5: Dune Miter Garter Pullover

BASIC INTERLOCKING MITER INSTRUCTIONS

Work in Garter st throughout.

STEP 3
Flat Bottom Panel

Work Step 2 Miter until half of the sts are on each ndl.
Project 8: Peasant Ruffle Pidge

BASKETWEAVE PATTERN
Rows 6, 8 & 10 (WS): K5, P5, K5, P5, K5.
Rows 7 & 9 (RS): P5, K5, P5, K5, P5.

PIDGE
Ruffle Edge
CO 50 sts. Next row (RS): Beg Row 1 Ruffle patt, completing 20 rows of Ruffle patt. Next row (RS): Knit. Next row (WS): *K2tog; rep from * across [25 sts rem].

Scarf Body
Next row (RS): Beg Row 1 of Basket Weave St. Work the 10-row pattern a total of 14 times. Work Rows 1-5 of Basket Weave patt.
Buttonhole Row 1 (WS): K5, P2, BO 3 sts, K5, P2, BO 3 sts, K5.
Buttonhole Row 2 (RS): P5, CO 3 sts, K2, P5, CO 3 sts, K2, P5.
Project 33: Cabled Slipper Socks

Turn Heel

Row 8: Sl 1, K10, K2tog [all sts have been worked; 12 sts rem].
Project 35: Woven Square Wrap

BASE TRIANGLES
Rep Rows 2–23, 3 more times; then Rep Rows 2–21 one more time.
Project 37: Ingrid Cap & Cowl

WICKER PATTERN
(in rows)
Row 11: *P1, K1, P1, K4, P1, K1, P1; rep from * across.
The chart is correct.