![]() |
December 2011 |
| Project 5: Dune Miter Garter Pullover BASIC INTERLOCKING MITER INSTRUCTIONS Work in Garter st throughout. STEP 3 Flat Bottom Panel Work Step 2 Miter until half of the sts are on each ndl. |
|
| Project 8: Peasant Ruffle Pidge BASKETWEAVE PATTERN Rows 6, 8 & 10 (WS): K5, P5, K5, P5, K5. Rows 7 & 9 (RS): P5, K5, P5, K5, P5. PIDGE Ruffle Edge CO 50 sts. Next row (RS): Beg Row 1 Ruffle patt, completing 20 rows of Ruffle patt. Next row (RS): Knit. Next row (WS): *K2tog; rep from * across [25 sts rem]. Scarf Body Next row (RS): Beg Row 1 of Basket Weave St. Work the 10-row pattern a total of 14 times. Work Rows 1-5 of Basket Weave patt. Buttonhole Row 1 (WS): K5, P2, BO 3 sts, K5, P2, BO 3 sts, K5. Buttonhole Row 2 (RS): P5, CO 3 sts, K2, P5, CO 3 sts, K2, P5. |
|
| Project 33: Cabled Slipper Socks Turn Heel Row 8: Sl 1, K10, K2tog [all sts have been worked; 12 sts rem]. |
|
| Project 35: Woven Square Wrap BASE TRIANGLES Rep Rows 2–23, 3 more times; then Rep Rows 2–21 one more time. |
|
| Project 37: Ingrid Cap & Cowl WICKER PATTERN (in rows) Row 11: *P1, K1, P1, K4, P1, K1, P1; rep from * across. The chart is correct. |
|